 |
 |
 |
|
 |
 |
|
|
|
|
|
|
|
|
Please take a moment and sign my Guest Book
Currently Working On Fuselage
Project Started
Sept. 2002
Site Updated
07/21/08
|
|
|
 |
|
|
|
 |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
|
|
|
|
|
Rudder/Vertical Stabilizer
The Vertical Stabilizer, which is an all flying rudder, was virtually 100% completed at the Zenith Aircraft Workshop. I strongly recomend that if you are even considering building a Zenith aircraft to go to the workshop. They have one scheduled each month. |
|
|
|
|
|
|
Elevator
Due to 2 rolls of film being lost by Walgreens and/or Kodak thereare no photos of the bulk of the elevator construction process. It was at this point I broke down and bought a digital camera. |
|
|
|
|
|
|
|
Horizontal Stabilizer |
|
|
|
| |